215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy

Product Details
Customization: Available
Connector Type: CCS1, CCS2, CHAdeMO, GB/T
Installation: Floor Type
Gold Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
14
Year of Establishment
2022-03-31
  • 215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy
  • 215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy
  • 215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy
  • 215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy
  • 215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy
  • 215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy
Find Similar Products
  • Overview
  • Main Products
  • Product Description
  • Company Profile
  • Exhibition
  • Apply to E-VEHICLE
  • Packaging & Shipping
  • Certifications
  • FAQ
Overview

Basic Info.

Number of Charging Interfaces
One Pile with Multiple Charges
Start Mode
RFID Authentic
Protection Class
IP54
Rated Power
100kw
Nominal Capacity
215kwh+-5%
Charge and Discharge Ratio
0.5c
Battery Voltage Range
500-900V
Number of Cycles
>5000 Times
Rated Voltage
672V-864V
Rated Frequency
50Hz
Installation Mode
Outdoor Installation
Heat Dissipation Mode
Air-Cooled/ Liquid-Cooled
After-Sales Service
2 Years Warranty and a Timely After-Sale Service
Operating Temperature/°c
-10°c-55°c
Certification
CE, ISO, RoHS
Warranty
24 Months
Photovoltaic Rated Power
100kw
Transport Package
Wooden Stake + Cardboard-Shell
Specification
40-foot container
Trademark
Future Digital Energy
Origin
Shenzhen
HS Code
8504409999
Production Capacity
50000

Product Description

Main Products

215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy

Product Description

 

215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy
215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy
 
215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy
215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy

 

TEN SAFETY PROTECTION
Over Voltage Protection YES Over Load Protection YES
Over Temperature Protection YES Grounding Protection YES
Under Voltage Protection YES Short Circuit Protection YES
Lightning Protection YES Electric Leakage Protection YES
Low Temperature Protection YES Emergency Stop Protection YES

Company Profile

        Future Digital Energy is a professional high-tech enterprise that integrates R&D production, sales and service. We are not only a manufactory of EV Charging Stations, but also committed to providing overall operation and charging solutions for electric vehicles, as well as the construction of charging facilities.

Why Choose US?
 
                            --Factory Direct
                   First-hand resources
                         no middlemen
                       competitive prices 
                            --OEM/ODM Service
                                                              Customized to meet all your specific needs
                                                                           A reliable manufactory
                                                                                                                                     --Fast And Safe                                                                                                                                                           Short production cycle                                                                                                                                                             Fast delivery
                                                                                                                            Strictly tested before shipment
 Welcome customers from all over the world to visit our factory and discuss cooperation~
215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy

Exhibition

        We attend the Smart E Europe 2023 Exhibition in Germany in June, talked with lots of like-minded people, and got a new insight about the EV charging industry.
        Global Sources Mobile Electronics Show and EV Charge Show 2023 are our next in line.

215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy

Apply to E-VEHICLE

215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy

Packaging & Shipping

Port Shenzhen
Lead time of sample  (days) 35 working days
 
215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy

Certifications

 

215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy
215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy

 

FAQ

215kwh Ess+100kw Css2 EV Charger CCS1 DC Fast Car Charging Station Net Zero E-Mobility Application Renewable Energy

Q1. What is your term of packing?
A: Generally speaking, the products are fixed and transported with cardboard shells + wooden stakes. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your term of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

Q3. What is your term of delivery?
A: FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 7 to 25 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.


 


Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.

Q8: How do you make our business long-term and good relationship?
A:We are a first-hand factory, and the price is always advantageous. We will provide continuous professional product services and strong after-sales support. Strive to provide customers with the best user experience and quality assurance.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier